Skip to navigation
A Vision for the Future

PHASE FOURApprox £45,000
  • Raising the floor at the base of the tower and installing a small kitchen.
  • Cutting a serving hatch through the tower wall, a previous entrance before the tower was built, into the proposed gathering area.
  • Removing all the War Memorial flags and plaques from the west end of the Nave and relocating them in the Memorial Chapel.

More...

Page count: 448